90
will be taken up, cleaned, and
laid in Jutland cement motor for
3 inches inward from
the bid being
pest.
of
Live mortar.
Where
the
face
the
in
necessary
hydraulic
bed
and side joints will be roughlyg
dressed to plane surfaces.
The dwarf parapet will be removed and the stones utilized in other places. The
will be taken
up,
the semi-
Coping circular moulding hewn off and the stones weathered to the shape
sheon in Showing he. 45 A. Su
the pelaging of
this
pests
upon
it to be
as much as
be as
possible of one uniforme thickness,
A
necessary feature in stones intended to be joggled together. The coping
stones will be laid in Portland cement
mortar 3 inches inwards all round.
their
prouted through
for edges and then joggles. The latter will be full depth diagonal 32 inch
the
square
holes
plugged with granite dowels grouteds
in neat liquid
Printing.
Puttand cemeat.
tall gaping points along
the face of the wall to
masoury
the
finish off
be naked out as
für
AV
possible and
the
main object will be to
the second
course from the top
parallel to the
gradients in
DKL
regular and unbroken line so
and
grooves filled and pointed with Roman cement in the tide wa
wayy Puttand cement above water.
Axt
to allow
of
the coping
course which
rests
No comments yet.
Private notes are available after approval.