CO129-181 - Governor Hennessy - 1878 [1-8] — Page 91

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

90

will be taken up, cleaned, and

laid in Jutland cement motor for

3 inches inward from

the bid being

pest.

of

Live mortar.

Where

the

face

the

in

necessary

hydraulic

bed

and side joints will be roughlyg

dressed to plane surfaces.

The dwarf parapet will be removed and the stones utilized in other places. The

will be taken

up,

the semi-

Coping circular moulding hewn off and the stones weathered to the shape

sheon in Showing he. 45 A. Su

the pelaging of

this

pests

upon

it to be

as much as

be as

possible of one uniforme thickness,

A

necessary feature in stones intended to be joggled together. The coping

stones will be laid in Portland cement

mortar 3 inches inwards all round.

their

prouted through

for edges and then joggles. The latter will be full depth diagonal 32 inch

the

square

holes

plugged with granite dowels grouteds

in neat liquid

Printing.

Puttand cemeat.

tall gaping points along

the face of the wall to

masoury

the

finish off

be naked out as

für

AV

possible and

the

main object will be to

the second

course from the top

parallel to the

gradients in

DKL

regular and unbroken line so

and

grooves filled and pointed with Roman cement in the tide wa

wayy Puttand cement above water.

Axt

to allow

of

the coping

course which

rests